FIELD HUBGEC2 — ELECTRICAL – LOW VOLTAGE

ACAMS Activation Checklist

GEC2 / Apex — Electrical & Low Voltage • LAX / LAWA Security Activation
ALL REQUIRED ACTIVATION DOCUMENTATION shall be uploaded and maintained on the SDACC site by the General Contractor (GC) including the SAR and NAR. The SAR is a living document maintained via the SDACC site. As relevant information is added to the SAR and NAR by the GC, LAWA fills in their respective fields; submit the NAR ASAP since critical information needed to complete the SAR is pulled from the NAR.
IDACAMS ActivityStatusNotes
General note: