Project Information
Job Steps · Hazards · Controls
Pick a task - hazards, controls, and a starting risk code fill in automatically. Edit anything to fit the day, then set the RAC. Add as many as you need.
Risk Assessment Code (RAC) Matrix
Cross severity (row) with probability (column) to find the RAC. Use the highest code across all steps as the Overall RAC above.
Severity / Probability
Frequent
Likely
Occasional
Seldom
Unlikely
Catastrophic
E
E
H
H
M
Critical
E
H
H
M
L
Marginal
H
M
M
L
L
Negligible
M
L
L
L
L
E = Extremely HighH = High RiskM = Moderate RiskL = Low Risk
Equipment To Be Used
Equipment
Training Required
Inspection Required
Activities Requiring a Competent / Qualified Person
Attach proof of competency. e.g. Excavation (>5 ft), Scissor/Aerial lift, Fall protection, Powder-actuated tools, LOTO / Qualified Electrical Worker.
Activity
Designated Competent / Qualified Person
Signatures - Verification of Review
Every crew member working under this AHA signs that they reviewed it.