Contractor QA/QC Door Checklist

Door Frame, Door, and Door Hardware Checklist • LAWA template (fillable copy) • GEC2 / Apex — Electrical & Low Voltage
#ItemY / NCommentsInitialsDate
1Doorjamb and door type meet LAWA Design & Construction Handbook requirements? (i.e. brand, model, type, material, etc.)
2Door hardware has additional backing inside the jamb and door to securely hold the hardware?
3Fire / UL listing labels present on door frame / door / hardware (if req'd)?
4If the door frame is rated, was the door frame modified? (drilled thru, cut, etc.) If YES, re-certification of door frame will be required.
5Doorjamb installed / fastened with approved LAWA DCH required anchors? Is the door jamb plumb and square?
6Door jamb installed on a level surface?
7Cross-sight of door jamb confirmed?
8If the door is rated, was the door modified? (drilled thru, cut, etc.) If YES, re-certification of door will be required.
9Caulking around door jamb reveal complete? (Exterior doors)
10Door swings freely with no obstructions, rubbing, binding, etc.?
11Door closes flush with door frame?
12Door opens 90 degrees with no obstructions? (some doors 180 degrees +)
131/8" reveal around sides and top of doors confirmed?
143/4" max space between bottom of fire door and finished product?
153/16" max gap at bottom of door confirmed?
16Exterior door sealed per California Building Code 1133B.2.4.1 (vermin control)?
17Confirmed door is not bowed, twisted, or crooked?
18Door and door jamb painted prior to installing hardware?
#ItemY / NCommentsInitialsDate
1Low voltage conduit to door frame installed properly with J-box mounted at frame?
2120VAC power provided at door for low voltage power supply installed?
#ItemY / NCommentsInitialsDate
1Hardware installed complies with the specified hardware schedule per project Plans & Specifications?
2Does hardware installed adhere to the LAWA Design & Construction Handbook requirements?
3Core is either Schlage or Medeco depending on keying plan?
4Strike plate and latch assemblies flush with door and frame?
5Fire bolts aligned at double doors (if req'd)?
6Confirmed jamb strike is not filed?
7Latch is centered with jamb strike?
8Threshold installed per manufacturer's recommendations? Sealant applied for exterior doors?
9Wall assemblies and required ratings completed on both sides of wall to a primer finish?
10All fasteners installed per the manufacturer's recommendations?
11Door hold open installed (if req'd)?
12Door hold open electrical inspection for infrastructure?
13Door closure setting per manufacturer recommendations?
14Door closure adjusted with air in the space on?
#ItemY / NCommentsInitialsDate
1ACAMS reader shall be labeled with the correct reader name.
2If ACAMS, is electrified hardware on the same side as card reader(s)?
3Electrical components inspected to its source? (material, supports, labeling, thru-wall penetrations, continuity test, panel schedules, etc.)
4Approved exemption request provided for any work, materials, or process not in line with LAWA DCH, IT, LAXPD, etc.?
#ItemY / NCommentsInitialsDate
1Door shall be permanently labeled with the correct program report identification number. Permanent label for top of door jamb; P-touch 1" black font acceptable temporarily.
2Door hold open operates correctly?
3Door hold open release operates correctly?
4Door closer speed adjusted properly?
5Door closer power adjusted properly?
6Latch engages completely with strike?
7Functionality of door and reader?
8If ACAMS, is electrified hardware set to fail secure?
9Door "Pop": Does the door re-latch without manual intervention?
10Doors free from defects / dust? All protective items removed to allow full inspection?
11Does lock function match the intended use of the space / room / door?
12Approved exemption request provided for any work, materials, or process not in line with LAWA DCH, IT, LAXPD, etc.?
This is a fillable copy of the LAWA "Contractor QA/QC Door Frame, Door, and Door Hardware Checklist" (template edited 11/19/2021). The verbatim LAWA PDF is also hosted in the hub.
LAWA Contractor QA/QC Door checklist. "Y/N" per item; record comments, inspector initials, and date. ACAMS doors require electrified hardware set to fail-secure and reader labeled to the correct reader name. Contractor QC, LAWA Inspector, and LAWA Representative sign-offs required.