Job Walk Checklist
Low Voltage & Security • Site walk / existing-conditions • GEC2 / Apex Cabling
Project / Job Name
Job #
Date
Site Address / Location
Walked By
Title
GC / Customer
Accompanied By
Walk Type
Bid / Estimating
Pre-Construction
Progress / Observation
Safety / Assessment
1. Key Rooms & Infrastructure — where is it?
IT / Server / MDF room — location?
IDF / TR (Telecom Room) — location(s)?
Main electrical room — location?
MPOE / Demarc — location?
Panel feeding our work — panel ID?
… and that panel is in which room?
What room/area are we working in?
Generator / UPS — location?
Security head-end / control room — location?
2. Cabling
Cable type(s) needed
Cat6
Cat6A
Cat5e
Fiber - Single-mode
Fiber - Multimode
Coax / RG6
Security (18/2, 22/4…)
Fire alarm
Speaker / paging
Other cable / notes
Est. drops / cable count
Existing pathway available
Cable tray
Conduit
J-hooks
Sleeves / penetrations
Open / free-air OK
None existing
New pathway / conduit required?
No
Yes
Ceiling type
Accessible (lay-in)
Hard lid / drywall
Open structure
Pathway notes
3. Power & Grounding
Power available at work area?
Yes
No
Partial
Spare breakers / circuits?
Dedicated circuit needed?
No
Yes
Grounding / bonding present?
Yes
No
Unknown
Power / grounding notes
4. Devices / Equipment (LV + Security)
Data outlets
WAPs
Cameras
Card readers
Door contacts / REX
Intercom
Speakers / paging
AV / displays
Other
Device counts / notes
Mounting heights / surfaces
5. Site Access & Conditions
Badging / escort required?
No
Yes
Work hours / restrictions
Parking / staging
Lifts / ladders needed?
No
Yes
Existing conditions / damage to document
6. Safety
Energized equipment
Heights / fall
Confined space
Hot work
Hazmat / asbestos
Overhead hazards
Safety notes
7. Photo Log
📷 Take Photo
↑ Upload Photos
On a phone “Take Photo” opens the camera. Add a caption + location to each.
8. Action Items / Follow-ups
Action items / clarifications needed
RFI needed?
No
Yes
If yes, subject
Walked By — Signature
clear
Print Name
Date
GEC2 / Apex Cabling — Electrical & Low Voltage. Job Walk Checklist (LV + Security). Attach photos, note room/panel locations and cable types, and file into the project's Job Walk folder.