Lockout/Tagout and energized-work permit. Verify zero energy before work; complete the NFPA 70E section only when work cannot be de-energized.
Lockout / Tagout steps — verify each
Lock / tag log
#
Authorized worker
Lock / Tag #
Time applied
Time removed
Energized work permit (NFPA 70E) — complete ONLY if work cannot be de-energized
Approvals
Qualified person
Print name
clear
Signature
Date
Supervisor
Print name
clear
Signature
Date
Owner / AHJ (if required)
Print name
clear
Signature
Date
GEC2 / Apex Cabling — Low Voltage Division. De-energize whenever feasible; energized work requires an approved NFPA 70E permit. Each worker applies their own lock & tag and removes only their own.