Daily T&M record. GC / Owner signature verifies the labor, material, and equipment expended — not an authorization of cost. Rates applied per contract on the invoice.
Verify CCL / PCO / CE / COR on every T&M ticket.
Signature below verifies the labor, material, and equipment shown were expended — it is not an authorization of cost. Rates & extensions are applied per contract on the invoice.
Labor
#
Worker name
Classification
Shift
Cost code
ST
OT
DT
Material
#
Qty
Unit
Material description
Cost code
Equipment
#
Equipment / tool
Hours
Notes
Daily T&M sign-off
Contractor foreman
Print name
clear
Signature
Date
GC / Owner representative
Print name
clear
Signature — verifies labor, material & equipment expended (not a cost authorization)
Date
GEC2 / Apex Cabling — Low Voltage Division. Verify CCL / PCO / CE / COR on every T&M ticket; FOL# (Field Order number) is the billing reference. Labor, material & equipment hours are field-captured here — rates and extensions are applied per contract on the Apex T&M invoice.