Field Hub

GEC2 Field Hub

One place for the field to fill out every form. Tap a card to open it.

Safety
AHA
Ready

Activity Hazard Analysis

Daily AHA with the Div 26/27 task library, RAC matrix, and crew sign-off.

GAS
Ready

Confined Space Gas Log

Atmospheric monitoring with auto PASS/EVACUATE status. O₂, LEL, CO, H₂S.

THA
Ready

Task Hazard Analysis

Crew hazard checklist, task steps/hazard/control, and break/lunch sign-off. Apex/GEC2 format.

TBT
Ready

Toolbox Talk / Safety Meeting

Weekly crew safety meeting + attendee sign-in with signatures.

LOTO
Ready

LOTO / Energized Work Permit

Lockout/Tagout + NFPA 70E energized-work permit. Lock/tag log.

HEAT
Ready

Heat Illness Prevention

Cal/OSHA §3395 — water, shade, acclimatization, temp log.

INC
Ready

Accident / Incident Report

Field incident capture with photo and routing for carrier / OSHA.

Testing & QC
GND
Ready

Grounding Test Record

Ground-resistance readings vs spec with auto PASS/FAIL. Reading-log engine.

BKR
Ready

Breaker / Insulation Test

Insulation-resistance readings vs minimum with auto PASS/FAIL. Reading-log engine.

MEG
Ready

Megger / Insulation Resistance

Per-conductor IR matrix (L–G, L–L, N–G) at test voltage, auto PASS/FAIL vs spec. Reading-log engine.

Scheduling
4WK
Preview

4-Week Lookahead

Plan crew activities four weeks out by area. Aligns with the live lookahead app.

Procurement
MRF
Preview

Material Request (MRF)

Request material from the field. Feeds the Procurement Tracker.

TREQ
Ready

Tool Request (TREQ)

Same engine as the MRF, for tools. Line items + cost codes.

TRN
Ready

Equipment Transmittal

Receiving / serial-number log with group headings and dual sign-off.

Field Reporting
DR
Preview

Daily Report

Manpower, hours, work performed, delays, and deliveries for the day.

T&M
Ready

Time & Material Ticket

Daily T&M: labor (ST/OT/DT), material, equipment + GC sign-off. FOL# / CCL/PCO ref.

WALK
Ready

Job Walk Checklist

LV + security site walk: locate IT/electrical rooms & feeding panel, cable types, conditions, safety, plus a photo log (camera or upload).

TIME
Ready

Weekly Time Card

Apex weekly time card — daily hours by employee, job/cost code, with sign-off. Save as PDF.

Compliance / Inspections
IREQ
Ready

LAWA IREQ (QACID)

Official LAWA inspection-request form, kept on file to print & submit. (Agency form — not rebranded.)

IR·T5
Ready

Inspection Request — T5

Fillable Hensel Phelps R12 Inspection Request, pre-set for LAX Terminal 5 (DA-5795.01). T5 project only.

IR·T5
Ready

T5 Inspection Request (Blank PDF)

Blank printable copy of the T5 (R12) Inspection Request, on file to print & submit.

RFI
Ready

Request for Information

One question per RFI with spec / drawing refs and a response block.

PL
Ready

Punch List / Deficiency Log

Deficiency tracker — location, responsible, status, date closed.

Equipment Inspections
LAD
Ready

Ladder

Ladder — pre-use safety inspection.

HARN
Ready

Harness & Lanyard

Fall-protection harness, lanyard & SRL inspection.

SCIS
Ready

Scissor Lift

Scissor lift pre-use inspection.

BOOM
Ready

Boom Lift

Boom lift pre-use inspection (incl. fall protection).

FORK
Ready

Forklift

Forklift / PIT daily inspection.

CORD
Ready

Cords & Spider Boxes

Extension cords & temp-power spider box inspection.

Activation & Commissioning
ACAM
Ready

ACAMS Activation

LAX/LAWA access-control portal activation checklist (30 steps).

CCTV
Ready

CCTV / Camera Activation

LAWA camera activation checklist (24 steps).

SW
Ready

Cisco Switch Sign-Off

LAWA Cisco network switch verification — PASS/FAIL + dual sign-off.

DOOR
Ready

Door QA/QC (fillable)

LAWA door frame / hardware QA/QC — fillable copy.

PDF
Ready

Door QA/QC (LAWA PDF)

Official LAWA door checklist (verbatim agency form).

Live module — ACAMS Activation Checklist. If blank, open in a new tab.
Live module — Camera Activation Checklist. If blank, open in a new tab.
Live module — Cisco Switch Sign-Off. If blank, open in a new tab.
Live module — Door QA/QC (fillable). If blank, open in a new tab.
Live module — Door QA/QC (LAWA PDF). If blank, open in a new tab.
Live module — this is the full Activity Hazard Analysis app running inside the Hub. If the form below is blank, click open AHA in a new tab.
Live module — Confined Space Gas Monitoring (reading-log engine). If blank, open in a new tab.
Live module — Grounding Test Record (reading-log engine). If blank, open in a new tab.
Live module — Breaker / Insulation Test (reading-log engine). If blank, open in a new tab.
Live module — Megger / Insulation Resistance Test (reading-log engine). If blank, open in a new tab.
Live module — Task Hazard Analysis. If blank, open in a new tab.
Live module — Tool Request (TREQ). If blank, open in a new tab.
Live module — Time & Material Ticket. If blank, open in a new tab.
Live module — Ladder Inspection. If blank, open in a new tab.
Live module — Harness & Lanyard Inspection. If blank, open in a new tab.
Live module — Scissor Lift Inspection. If blank, open in a new tab.
Live module — Boom Lift Inspection. If blank, open in a new tab.
Live module — Forklift Inspection. If blank, open in a new tab.
Live module — Cords & Spider Boxes Inspection. If blank, open in a new tab.
Live module — Toolbox Talk / Safety Meeting. If blank, open in a new tab.
Live module — LOTO / Energized Work Permit. If blank, open in a new tab.
Live module — Heat Illness Prevention. If blank, open in a new tab.
Live module — Punch List / Deficiency Log. If blank, open in a new tab.
Live module — Equipment Transmittal. If blank, open in a new tab.
Live module — Request for Information. If blank, open in a new tab.
Live module — Incident / Accident Report. If blank, open in a new tab.
Official LAWA Inspection Request (IREQ) form — on file to print & submit (not a GEC2/Apex form). If blank, open in a new tab.
Live module — LAX T5 Inspection Request (Hensel Phelps R12), pre-set for Terminal 5. If blank, open in a new tab.
Blank printable T5 Inspection Request (R12) — on file to print & submit. If blank, open in a new tab.
Live module — Job Walk Checklist (LV + Security) with photo capture. If blank, open in a new tab.
Live module — Weekly Time Card (Apex). If blank, open in a new tab.

4-Week Lookahead

G2.0 Electrical Contracting • Electrical – Low Voltage Division

Header

Planned activities

Activity / scopeArea / locationCrewWk 1Wk 2Wk 3Wk 4
UPON COMPLETION ATTACH THE MRF TO THE APPROPRIATE PROCORE REQUEST.
MATERIAL / TOOL REQUEST FORM
1545 W. El Segundo Blvd. Gardena CA 90249
LIC# 1027180 • Certified LBE, MBE, UDBE
Ordered by
Procore MRF #
Project address
Project mgr
Date ordered
Job name
Date needed
Job #
Time needed
Field contact
Phone #
HFR = Hold For ReleaseIf equal allowed, type (Y) under the EQUAL column
#QTYHFR EQUAL
(Y/N)
Part # Exact description of material / toolCost code

Daily Construction Report

G2.0 Electrical Contracting • Electrical – Low Voltage Division

Report header

Observed weather

Manpower

Classification# WorkersHours

Delays

TypeDescriptionDuration (hrs)Impact

Notes

Timecards

EmployeeClassificationST hrsOT hrsCost code

Equipment

EquipmentSupplierOperating hrsIdle hrsQty

Visitors

NameCompanyPurposeTime inTime out

Phone calls

TimeTo / fromSubjectNotes

Inspections

TypeInspector / agencyTimeResultNotes

Deliveries

TimeSupplierContents / PO #Received byNotes

Safety violations

DescriptionPerson / companyCorrective action

Accidents / incidents

DescriptionPerson involvedInjury / treatmentAction taken

Quantities installed

Cost codeDescriptionUnitQty installed

Dumpster

Type / sizeHaulerActionNotes

Waste / recycling

MaterialQtyDisposal methodHauler

Scheduled work

ActivityAreaCrewStatus

Photos

Daily construction summary